Skip to content
FOMO Spark

Summarise with AI

Insight

How long does a launch video take? A week-by-week timeline

A launch video takes 3 to 4 weeks from kickoff when it is made as part of a launch campaign: script, storyboard, animatic and final, with your sign-off at each. Here is each week, what you approve, and where time is lost.

Miki Adamus, Founder, story and creative at FOMO Spark

Published

A launch video takes 3 to 4 weeks from kickoff when it is made as part of a launch campaign: the hero video, the cutdowns for each channel and the static ads all come from the same production. It can be done in 18 days with a fixed date and fast decisions; NoScroll was. It cannot be done well in a week.

What happens before week 1?

A 30-minute call: what you are launching, when, who has to get it, and what they do not get today. You leave with a recommended offer, a timeline and a price, all on our pricing page. Kickoff is within a week of signing.

Week 1: what is the story?

We find the one thing the campaign has to make clear and write the script around it. You sign off the script. Time lost here: waiting for a stakeholder who was not on the call.

Week 2: what will it look like?

A storyboard of every scene, with notes, and the look of the final video. You sign off the storyboard. After this point the story and the look are locked; changing them later costs days instead of hours. On a Campaign System, the landing page structure comes from the same story this week.

Week 3: does the timing work?

An animatic with the timing and the voice-over, so you see the pacing before anything is animated. You sign off the animatic, then animation starts.

Week 4: what ships?

The final hero video with sound design, vertical cutdowns for X, LinkedIn and TikTok, and static ads from the same frames. Every gate has two rounds of revisions. Delivery lands before the launch date, with room for a last change.

Where do 18 days come from?

Decisions on the same day, one decision-maker, and no stakeholder who sees the video for the first time at the end. Every launch we have seen slip was a story change after the storyboard was signed off. The launch campaign plan shows the same weeks with every asset on them, and the product launch checklist turns them into a list.

What should you have ready before the first call?

The launch date, a working product or a demo, any brand assets, and the person who decides. You do not need a brief or a script, though a short brief helps.

Questions

How long does a launch video take?

3 to 4 weeks from kickoff for a Campaign, with the hero video, cutdowns and static ads from the same production. A Campaign System, with a landing page and teasers, takes 4 to 6 weeks.

Can a launch video be made faster?

Yes, with a fixed date and fast decisions. NoScroll went from first call to launch in 18 days. What it cannot survive is a story change after the storyboard is signed off.

How long should a launch video be?

45 to 90 seconds for the hero video. Long enough to show the problem, the one idea and the product working, short enough to be watched to the end on a phone. The cutdowns for each channel are shorter.

What do we need ready before the first call?

The launch date, a working product or a demo, any brand assets, and the person who decides. You do not need a brief or a script.

Book a call

Got a campaign this quarter?

Book a call. In 30 minutes we’ll tell you what your launch is missing, and what it needs.