Skip to content
FOMO Spark

Summarise with AI

Insight

Product launch checklist for crypto and AI teams

Ship the story first, the assets second and the reach last. This checklist covers a crypto or AI product launch in five phases, from six weeks out to the month after, the way we run launches as a go-to-market agency.

Published

How do you use this checklist?

Work through it in order. Each phase assumes the one before it is done, and the sign-offs are the points where changes stop being cheap.

The phases are set for a full launch campaign: a hero video, cutdowns, static ads and a landing page, all from one story. For what that campaign includes and costs, see launch campaigns and pricing.

What matters most?

Two things, both in the first phase: the one thing people need to get, and the one number that says the launch worked. NoScroll had both before a single frame was made: the internet collapsing into one iMessage, and user growth. The launch brought 5x users in 48 hours. Read how it was made.

If you want the same launch as a week-by-week table, it is in our launch campaign plan.

The checklist

01 · Six weeks out

  • Pick the launch date and the one number that says it worked
  • Name the audience in one sentence
  • Write the one thing people need to get, in one line
  • Book whoever makes the assets, and agree who signs off what
  • List the channels, and the assets each one needs

02 · Two weeks out

  • Script signed off
  • Storyboard signed off
  • Animatic signed off
  • Landing page copy written from the script
  • Static ad sizes listed for every channel
  • Tracking set up on the landing page

03 · Launch week

  • Final video signed off
  • Vertical cutdowns and static ads exported
  • Landing page ready, with the video above the fold
  • Teasers out, with the date
  • Partners and press briefed, with the assets in hand

04 · Launch day

  • Hero video posted natively and pinned
  • Landing page live
  • Cutdowns and ads out on every channel
  • The team reposts with the same line
  • Watch the one number

05 · The month after

  • Read the number against the launch window
  • Post the cutdowns you held back
  • Plan the next variants from the same story
  • Keep the source files for the next round

Questions

What should a product launch checklist include?

The date and the metric, the audience and the one thing, the sign-offs, every asset each channel needs, the launch day order and what happens in the month after. The checklist on this page has all of them in five phases.

When should you start planning a product launch?

Six weeks out is comfortable for a full campaign. A Campaign with us takes 3 to 4 weeks from kickoff, and NoScroll went from first call to launch in 18 days, but the earlier the date is fixed, the cheaper every change is.

What is the most common product launch mistake?

Making the assets before the story is signed off. The video, ads and landing page then say slightly different things, and the launch loses people between them.

Do we need all of this for a small launch?

Keep the first phase and launch day in full. For a small feature you can drop the teasers and the deck, but not the one thing, the sign-offs or the metric.

Book a call

Got a campaign this quarter?

Book a call. In 30 minutes we’ll tell you what your launch is missing, and what it needs.